Enquire Now

Growth and prosperity define our landmark Bagalur Logistics Park

Bagalur Warehouse Banner Bagalur Warehouse Banner

About the park

Our sustainable & well-equipped Grade A logistics park in Bagalur, Bangalore is strategically located on State Highway 17 with excellent connectivity to nearby conveniences & major markets.

Quick facts

Location

State Highway 17, Bagalur, Tamil Nadu

Coordinates

Bagalur

Total Project Area

38.94 acres

Total Built-Up Area

9.5L Sq.ft.

Project Consultants

Engineering and Architect: Tata Consulting Engineers

Enquire with us

General Enquiries

For Land/ Lease Enquiries

Thank you for your interest and faith in sharing lead details with us.

To build on the level of transparency and enhance communication with you, each of our partners can now register on our portal and introduce new leads for land transactions (Outright, JVs or DM options) or leads for fulfilling warehouse lease requirements across India.

Click on the link below to register.

About Bagalur

Bagalur is well connected to Hosur-Malur road and major consumption centres in and around Bangalore which enables our Grade A logistic park to have greater accessibility.

Location Advantage

Located at State Highway 17 with excellent connectivity to Hosur-Malur road and close proximity to major markets. The park has advantage of incredible accessibility to major consumption markets through Bagalur via Bangalore-Malur Highway, Hosur via National Highway 48 and Hoskote via Bangalore-Chennai Expressway.

62 kms from Bangalore International Airport

46.4 kms from Bagalur Railway Station

27 kms from Whitefield

Master plan layout

Features

  • Park Level Features
  • Building Level Features
  • Sustainability Features

Pre-built state-of-the-art infrastructure to the last mile connectivity (plug & play)

24x7 manned security gate with CCTV & boom barrier at main park entrance

Asphalt road for access and internal circulation of 40.ft containers

Power availability at the park to supply power 1.25 KVA / 1000 Sq.ft.*

External lighting to common areas and roads

Green belt with tree plantations and drip/sprinklers irrigation system

Sewage Treatment Plant

Property management office

Driver's rest area & toilets

Fire fighting ring main loop with fire hydrants, water storage tank & pump room as per NBC standard

Rainwater harvesting

IOT based parking management

Structure
Pre-engineered building, optimised column spacing, and mezzanine level for office

Wall
Pre-cast concrete walls up to 3.5 mt. and metal panels upto roof

Truck Apron
Concrete, 16.5 mt. (from the face of dock wall to edge of pavement)

Ventilation
Passive ventilation to provide 3-6 air changes through louvred panels on external walls and roof monitor

Roof
Standing seam roof system designed to take solar panel load

Clear Height 12 mt.

Skylight
Energy-efficient lighting and skylights

Parking
For two and four-wheelers at the office entrance

Dock Doors, & Drive-In Doors
Electrically operated rolling shutters

Power Load
Single/three phase power connection from local substation - 1.25 KVA / 1000 Sq.ft.

Floor
5T/MT2. UDL, 7T Point Load FM2-compliant

Fire Detection
Fire fighting & suppression systems as per NBC

Solar Power
Alternate & energy efficient solar power source

37% reduction in water usage by using low flow fixtures

100% water treatment, 51% of it will be used in irrigation

11% less consumption of electricity w.r.t ECBC base case

96.1% of construction waste will be diverted for reuse and recycle

68% of materials to be used in the project will be eco-friendly